Friday, April 26, 2013

April Showers...

South face of Chapel showing siding and paint on Area B.
Town Square (photo taken from Second Floor, Area B)

Resident Bathroom with completed tile and counter top (B2)

B2 Corridor showing handrail, ceiling grid and light fixtures.

Kitchen

Friday, March 15, 2013

Almost Spring

South face of the Chapel with stone work and the window opening behind the Alter

Future Town Square facing the Snack Bar and corridor leading to Area D


Dining Area with door leading to porch in Area B2


Courtyard of D Wing (left) and B Wing (right)

West elevation showing B Wing on the left, Front Entry and Chapel (far right)

Friday, January 25, 2013

A New Year

West Exterior Elevation

Main Entry facing Beauty Parlor and Entrance to North Wing

Overlooking Chapel Entrance from the Second Floor 

North Wing Dining Area and Hallway

Corridor connecting to the Existing Facility

Tuesday, November 27, 2012

Taking Shape

Area D Structural Steel

Interior of B Wing - Second Floor

Elevation of Area A

Chapel Ceiling

Interior of Area A (Future Main Street)

Kitchen Area

Monday, October 29, 2012

Friday, September 28, 2012

Solid Steel

Via Christi Village Ridge, New Construction by Simpson Construction Services, Wichita
Areas A & C Structural Steel
Via Christi Village Ridge, New Construction by Simpson Construction Services, Wichita
Area A Structural Steel (Kitchen Area)
Via Christi Village Ridge, New Construction by Simpson Construction Services, Wichita
Area A & C Structural Steel
Via Christi Village Ridge, New Construction by Simpson Construction Services, Wichita
Area D Foundations
Via Christi Village Ridge, New Construction by Simpson Construction Services, Wichita
Area B Slab Setup
Via Christi Village Ridge, New Construction by Simpson Construction Services, Wichita
Area B Underground Electrical