Friday, April 26, 2013

April Showers...

South face of Chapel showing siding and paint on Area B.
Town Square (photo taken from Second Floor, Area B)

Resident Bathroom with completed tile and counter top (B2)

B2 Corridor showing handrail, ceiling grid and light fixtures.

Kitchen

Friday, March 15, 2013

Almost Spring

South face of the Chapel with stone work and the window opening behind the Alter

Future Town Square facing the Snack Bar and corridor leading to Area D


Dining Area with door leading to porch in Area B2


Courtyard of D Wing (left) and B Wing (right)

West elevation showing B Wing on the left, Front Entry and Chapel (far right)

Friday, January 25, 2013

A New Year

West Exterior Elevation

Main Entry facing Beauty Parlor and Entrance to North Wing

Overlooking Chapel Entrance from the Second Floor 

North Wing Dining Area and Hallway

Corridor connecting to the Existing Facility