Friday, April 26, 2013
April Showers...
South face of Chapel showing siding and paint on Area B.
Town Square (photo taken from Second Floor, Area B)
Resident Bathroom with completed tile and counter top (B2)
B2 Corridor showing handrail, ceiling grid and light fixtures.
Kitchen
Newer Posts
Older Posts
Home
Subscribe to:
Posts (Atom)